CEZ operating profit stays flat in Romania

13 May 2015

Czech energy group CEZ’ operating profit in Romania stagnated in the first quarter of 2015 at EUR 29.2 million, compared to the same period last year.

The increase in energy production has offset the negative effect of suspending green certificate allocation for the Cogealac wind farm.

CEZ owns in Romania the Fantanele wind park, with an installed capacity of 347,5 MW, the Cogealac park (252,5 MW) and a series of micro hydropower plants with a total capacity of 18 MW.

The Czech group posted a profit of EUR 7.3 million in Romania in the first quarter, calculated before interest, taxes, depreciation and amortization (EBITDA).  It was similar to the result from the first three month of the last year.

editor@romania-insider.com

Normal

CEZ operating profit stays flat in Romania

13 May 2015

Czech energy group CEZ’ operating profit in Romania stagnated in the first quarter of 2015 at EUR 29.2 million, compared to the same period last year.

The increase in energy production has offset the negative effect of suspending green certificate allocation for the Cogealac wind farm.

CEZ owns in Romania the Fantanele wind park, with an installed capacity of 347,5 MW, the Cogealac park (252,5 MW) and a series of micro hydropower plants with a total capacity of 18 MW.

The Czech group posted a profit of EUR 7.3 million in Romania in the first quarter, calculated before interest, taxes, depreciation and amortization (EBITDA).  It was similar to the result from the first three month of the last year.

editor@romania-insider.com

Normal
 

facebooktwitterlinkedin

1

Romania Insider Free Newsletters